Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The piling drill supports a variety of photovoltaic construction technologies such as spiral piles and spiral hole drilling. It uses imported hydraulic components to ensure performance. Stable and precise construction is a powerful assistant in the field of solar energy engineering, ensuring efficient construction.
Impact frequency(bpm) | 450-800 |
Impact(J) | 1000 |
Skid pitch(º) | 120 |
Boom swing angle(º) |
left and right total 50 |
Swinging angle of the skid(º) |
left and right total 40 |
Climb ability(º) |
35 |
Dimension(L*W*H)(mm) |
6410*1970*2830 |
Weight(kg) |
5800 |
Walk speed(km/h) |
0--2.5 |
For rotary drilling |
|
Bore diameter(DTH hammer)(mm) |
90-300 |
Bore depth(m) |
20-100 |
Air consumption(m³/min) |
10-26 |
Air pressure(Mpa) |
0.7-1.6(medium) 1.6-2.46(high) |
Bore diameter(screw)(mm) |
Max 600 |
Bore depth(m) |
0-30 |
Rotation speed(r/min) |
0-110 |
Torque(N.M) |
7000 |
Delivery time :10-15days
shipping :RC260Y2 Hydraulic Solar PV Pile Driver can be loaded into 40" high container .
1,24/7 service by chat online and phone.
2,Lifelong and free technical support.
3,Service overseas: if you need, we can dispatch an engineer to your door.